Reference list

LLC NPO TeploKhimMash


OJSC “SARATOVSTROYSTEKLO”
Sulfur dioxide tank with attached pipeline
r. Saratov
Tank 2m3– 2 PCS, pipelines - 100m
Development and installation of a removable electrical heating system with insulation. (General contractor)
4 neighborhood 2007

———————————————————————————

Oil Gathering Station, well No. 1 "Uzenskaya"
Saratov region, Novouzensky district.
Pipeline - 64m.
LLC Caspian Gas Company
Development and installation of an electric heating system for an oil loading pipeline (General contractor)
January 2008

——————————————————————————————-

Flowmeters for GIS "Purtazovskaya", r. New Urengoy
r. Saratov
flow meter (ø730mm, 1,5m)– 4 PCS

———————————————————————————————–

OOO Zavod SaratovGazavtomatika
Development and installation of an electrical heating system for flowmeters. (General contractor)
April-May 2009.

———————————————————————————————–

OJSC "Kaustik" Production of PVC
r. Sterlitamak, RB
Pipelines - 1500m
OJSC "Caustic"
Development, supply and commissioning of the electric heating system for pipelines at PVC production
Development – March-June, the setting – August-October, commissioning - November 2009.

—————————————————————————————————

OJSC "Caustic", factory building
r. Sterlitamak, RB
Roofing - 1450 m2
OJSC "Caustic"
Development, supply and commissioning of the anti-icing system for the roof of the factory building
Development – June-November, delivery - November-December 2009. commissioning - February 2010.

———————————————————————————————–

Oil Gathering Station, well No. 1 "Uzenskaya"
Saratov region, Novouzensky district.
Pipeline - 200m.
LLC Caspian Gas Company
Development and installation of an electric heating system for oil and gas pipelines (General contractor)
february 2010

———————————————————————————————–

OJSC "Kaustik" Plant for evaporating caustic soda solution
r. Sterlitamak, RB
Pipelines - 300m
OJSC "Caustic"
Development, supply and commissioning of the electric heating system for pipelines at the caustic soda solution evaporation plant
Development – June-October 2010, the setting – December 2010-March 2011. commissioning - September 2011.

—————————————————————————————————

LLC "Henkel Rus" pipelines with alkyl benzolic acid and alkali
r. Engels, Saratov region.
Pipelines - 245m
Henkel Rus LLC
Development and installation of an electrical heating system for pipelines (general contractor)
January 2011.

——————————————————————————————————-

OJSC “Pigment” Formalin and phenol containers
r. Tambov
Tanks 10m3– 2 PCS, 25m3 – 1 pc, 100m3-2PCS
OJSC “Pigment”
Development and supply of electric heating systems for tanks
March- May 2011.

——————————————————————————————————–

OJSC “Neklinovsknefteprodukt”, oil tank
Rostov region, Neklinovsky district, with. Pokrovskoe
Reservoir 2000m3
OJSC “Neklinovsknefteprodukt”
Development and supply of an electric tank heating system
June-July 2011.

———————————————————————————————————–

Usolye-Sibirsky Silicon LLC, production of polysilicon
r. Usolie-Sibirskoe, Irkutsk region.
Tanks 50m3, 10m3,
35m3
Company “NPO "SINEF-Engineering"”
Development and supply of an electrical heating system for process tanks
June 2011.

————————————————————————————————————-

OAO Cherepovets Azot
Workshop Ammonia 1
r. Cherepovets, Vologda region.
Impulse lines 950m
OAO Cherepovets Azot
Development and installation of pre-insulated heated impulse lines in the Automatic Gas Analysis System (general contractor)
Development January-March, installation and commissioning June-July 2011.

————————————————————————————————————–

FKP «Zavod im. Sverdlov
r. Dzerzhinsk, Nizhny Novgorod region.
Pipelines - 100m
LLC "Alliance-trade"
Development and supply of electric heating systems for pipelines
September 2011.

———————————————————————————————————-

LLC "Henkel Rus" pipelines with alkyl benzolic acid and alkali
r. Engels, Saratov region.
Pipelines - 160m
Henkel Rus LLC
Development and installation of an electrical heating system for pipelines (general contractor)
March 2012.

——————————————————————————————————–

OOO Lukoil-Nizhnevolzhsk Neft
r. Astrakhan
pipelines
OOO Lukoil-Nizhnevolzhsk Neft
Oil Platform. Korchagina
2012r.

—————————————————————————————-

Object No. 1596 (destruction plant hmm. weapons)
r. Kizner, Udmurt Republic
Pipelines 5000m
FSUE "USTT No. 6"
Development and supply of electric heating systems for pipelines
2013-2014r.

———————————————————————————————

OJSC “CVD Red Barricades”
r. Astrakhan
pipelines
OOO Lukoil-Nizhnevolzhsk Neft
Oil Platform. Filanovsky

———————————————————————————-

NK Northern Lights
pipelines
NK Northern Lights
Supply contract signed

————————————————————————————-

Volzhsky terminal (Balakovsky MEZ)
D. Balakovo
Pipelines, RVS tanks 2000 – 5 PCS
Holding "Solar Products" (B2B Development)
Design, stand and installation

————————————————————————————-

LLC "Penzneftekhimmash"
r. Beloyarsky, Tyumen region
Tanks 100m3 and 200m3
TPP RITEKBeloyarskneft
Development and supply of electric tank heating systems

—————————————————————————————–

KPPK "Primorkraystroy"
r. Vladivostok, about. Russian
Clean water tanks 5000 cubic meters.
KPPK "Primorkraystroy"
Development, the setting, installation and commissioning of tank electric heating systems (subcontract)
Development August, installation and commissioning September-November 2014

———————————————————————————————-

Ammonia production complex, methanol and carbamide OJSC "AMMONIY"
D. Mendeleevsk, Tatarstan
Pipelines
JSC "NIIK"
Development, the setting, installation and commissioning of electric heating systems for pipelines (subcontract)
March, April 2015 r.

————————————————————————————————–

OAO "NAFTAN"
D. Novopolotsk, Belarus
Pipelines, containers
LLC Innovative Gas Technologies
Supply of electrical heating systems
February 2015 r.

————————————————————————————————–

LLC "Penzneftekhimmash"
r. Beloyarsky
Capacity
UUN TsPS "Stone", r. Beloyarsky
Supply of tank electrical heating systems
July 2015 r.

—————————————————————————————————–

Field them. Vinogradova
Yugra, Tyumen region.
Capacity
LLC "Penzneftekhimmash"
Supply of tank electrical heating systems
July 2015 r.

—————————————————————————————————–

Flare facility "SamaraTransNeft Terminal"
flare plant
LLC Innovative Gas Technologies
Development and supply of flare stack heating systems
July 2015 r.

——————————————————————————————————

LLC "Business Resource"
Ulyanovsk region, Molvino
Oil farm/refinery
New technologies
Development, the setting, installation of thermal insulation and electric heating systems for pipelines and tanks. commissioning
July-October 2015 r.

———————————————————————————————————-

OAO Yamal Railway Company
New Urengoy, p. Korotchaevo
A group of tanks and loading and unloading devices of the locomotive depot of the Korotchaevo station
LLC "StroyAvtoMontazh"
Development, the setting, installation and commissioning of electrical heating systems for fire-fighting tanks (subcontract)
September October 2015 r.

————————————————————————————————————

Ammonia production complex, methanol and carbamide OJSC "AMMONIY"
D. Mendeleevsk, Tatarstan
Roof
JSC "NIIK"
Development, the setting, installation and commissioning of electric roof heating systems (subcontract)
March, April 2016 r.

—————————————————————————————————————

Construction of the 2nd stage of the Blagoveshchenskaya CHPP
D. Blagoveshchensk
Pipelines
JSC Lonas Technology
Development, the setting, supervised installation and commissioning of electric heating systems (heating, thermal insulation, power distribution), pipelines
2016 r.

——————————————————————————————————————

OOO Bashneft-Polyus , Development of the field. R. Trebsa and A. Titova
D. Usinsk
RVS tanks 1000 m3
LLC NPP Gazenergokhim
Development and supply of electric tank heating systems
Maybe 2016 r.

——————————————————————————————————————-

Flare facility "SamaraTransNeft Terminal"
D. Samara
Flare separator piping
LLC Innovative Gas Technologies
Development and supply of electric heating system for flare separator pipelines
January 2017 r.
CALL ME
+
Call me!

ООО "ТеплоХимМаш"